Cruz General Contractors, home Request an estimate ES

Home / Guides / Roofs

Roofs6 min read

How to prepare and seal your concrete roof before hurricane season

Inspection, cleaning, crack repair and sealing: the steps to reach the season with your roof ready.

How to prepare and seal your concrete roof before hurricane season

Flat concrete roof half-coated with white elastomeric sealant, roller and bucketIllustrative image

Published: By Cruz General Contractors

The Atlantic hurricane season officially runs from June 1 to November 30. A well-maintained, sealed concrete roof helps prevent leaks when heavy rains arrive. This guide explains the general steps; the exact details depend on the product you use and the condition of your roof.

1. Pick the right time

Plan the work before the season and on dry days. Each sealant’s technical data sheet lists the minimum temperature, how long it needs without rain and the drying time between coats. Follow those instructions: applying on a damp surface or with rain coming is a common reason a coating fails.

2. Inspect the roof

  • Cracks, especially at corners, edges and around equipment or pipes.
  • Old coatings that are lifting, blistering or peeling.
  • Puddles that remain after rain (ponding water).
  • Clogged drains, gutters and downspouts.
  • Rust stains, spalling concrete or exposed rebar.
Signs you should call an engineer: exposed rebar, concrete breaking off, wide or growing cracks, or a slab that looks sunken. A sealant will not fix that: it needs a structural evaluation by a licensed professional.

3. Clean and prepare the surface

Remove leaves, dirt, moss and loose coatings. If the manufacturer allows it, pressure-wash and let the roof dry completely. Adhesion depends on a clean, dry, sound surface.

4. Repair cracks and weak spots

Fill cracks with a product compatible with the coating system you will use. Many systems recommend reinforcing cracks, corners and joints with reinforcing fabric or mesh embedded in the product. Follow the manufacturer’s sequence.

5. Primer and coats of sealant

Some systems require a primer before the coating. Apply the number of coats and the coverage per gallon stated on the data sheet, and let each coat dry. Applying less product than specified reduces protection.

How many gallons do I need?

A general way to estimate it: gallons = roof area (ft²) × number of coats ÷ coverage (ft² per gallon per coat). For example, a 30 × 40 ft roof is 1,200 ft². If the product covers 100 ft² per gallon per coat and needs 2 coats: 1,200 × 2 ÷ 100 = 24 gallons, before waste. Use your product’s real coverage; the one in the example is only illustrative.

The estimator does this calculation with editable coverage and coats, and shows prices checked at Puerto Rico hardware stores with their date.

6. Look after drainage

Keep drains and downspouts clear before and during the season. If puddles always form in the same spot, ask for an evaluation: slopes may need correcting or drains may need to be added.

7. Safety

Working on a roof is working at height. Don’t go up in rain or wind, wear proper footwear and fall protection, and consider hiring an experienced crew.

Summary

  1. Plan before June and on dry days.
  2. Inspect and document with photos.
  3. Clean, repair and reinforce.
  4. Apply the full system per the manufacturer.
  5. Keep drainage clear.
This guide is general and educational. It does not replace an evaluation by a licensed professional, the manufacturer’s instructions or the determination of the competent agencies or municipality.
$25

The online estimate is free and preliminary. The official quote, with a visit from a Cruz General Contractors professional to measure and inspect, costs $25. That $25 is credited to the job total when the work is done with Cruz General Contractors. Nothing is charged on this site.

Published with deed.pageReport abuse